A cement price per bag and a price per tonne describe different sales units. Comparing the numbers 180 and 7200 without conversion tells you nothing about which purchase costs less. First convert the offers to the same unit of mass. Then calculate separately how many whole bags you must pay for.

Check the bag weight and compare the same product

In this article, a tonne means 1000 kg, as defined in the SI Brochure from the International Bureau of Weights and Measures. We use a 25 kg bag for the example. CEMARK lists this bag size on its bagged cement page. This does not mean that every cement comes in this size: check the weight of the actual product.

Compare the same cement with the characteristics that you need. The same price per kilogram does not make different products interchangeable. Also ask whether taxes, packaging, delivery and unloading are included. The figures below are hypothetical and are not current offers from CEMARK or any other seller.

Cement price per bag to price per tonne: how to convert

Hypothetical price of a 25 kg bag: UAH 180.

Price per kilogram: 180 ÷ 25 = UAH 7.20/kg.

Equivalent price per tonne: 7.20 × 1000 = UAH 7200/t.

Number of 25 kg bags in a tonne: 1000 ÷ 25 = 40.

Cross-check: 40 × 180 = UAH 7200.

The reverse conversion is: price per tonne × bag weight ÷ 1000. For a hypothetical UAH 7600/t, this is 7600 × 25 ÷ 1000 = UAH 190 per 25 kg. With all other conditions equal, the UAH 180 offer for 25 kg costs UAH 10 less for the same mass. However, this conversion does not establish that the seller will supply any fraction of a tonne.

Why the same unit price produces different bills

Consider a separate educational example: a requirement of 125 kg of cement without an allowance. We assume a 10% allowance for losses. This is our assumption, not a manufacturer's standard or a recommendation for a screed mix. The requirement including the allowance is 125 × 1.10 = 137.5 kg.

Calculated cost of the exact mass at UAH 7200/t: 137.5 ÷ 1000 × 7200 = UAH 990.

25 kg bags: 137.5 ÷ 25 = 5.5. Round up to 6 bags for purchasing.

Mass paid for: 6 × 25 = 150 kg.

Cost of the bags: 6 × 180 = UAH 1080.

Difference: 1080 − 990 = UAH 90 for an extra 12.5 kg because the bags must be bought whole.

The unit prices here are the same. The purchase mass creates the difference. Do not add another 10% to the six bags: the allowance is already included in 137.5 kg. If you buy the same cement for several areas, add the requirements in kilograms before rounding the number of bags.

For several rooms there is a separate guide: screed in several rooms.

What the price modes in Budova mean

In the screed materials calculator, the tonne / 25 kg switch is next to the cement price. For comparison, enter both corresponding prices manually: 7200 in tonne mode and 180 in bag mode. Switching modes alone does not guarantee conversion of your price: the modes store separate values.

How to read the estimate total is explained in tile estimate in Budova.

In tonne mode, the calculator estimates the cost of the calculated cement mass. In 25 kg mode, it calculates the cost of whole bags, rounded up. A change in the total with the same price per kilogram can therefore be correct. The switch does not mean that the supplier agrees to sell the exact mass.

When we checked the public screen on November 8, 2026, the base cement mass was 25 kg with unchanged geometry and a 10% allowance. Including the allowance, the calculation gave 27.5 kg, while the screen displayed a rounded 28 kg and two bags. With UAH 7200/t entered manually, the cement cost including the allowance was UAH 198. At UAH 180 per bag, two bags cost UAH 360. This checks price and rounding behavior, not the mix recipe or the required screed thickness.

The layer volume formula is covered in screed volume in cubic meters.

Compare the full purchase estimate

The screed total in Budova also includes sand. To compare cement alone, look at its rows while keeping the geometry, allowance, mortar grade, sand and currency unchanged. Check your own inputs and price before buying: default values are not an invoice from a supplier.

Outside the calculator, add confirmed delivery costs and account for the seller's minimum order. If the seller supplies only a full tonne, the amount calculated for 137.5 kg is not an available order price. The calculation helps compare units and packaging. It does not determine the construction method, cement suitability or final commercial terms.